Kalrez Support Division


KALREZ WIRELINE DIVISION

[18/04/2009]

Our Goal is to assist Kalrez Petroleum (Seram) Ltd. attain an effective and efficient operation by delivering quality service of high technical value.

Kalrez Wireline is a division of Operation Department at Kalrez Petroleum (Seram) Ltd, a leading energy company in Indonesia.

Kalrez Wireline delivers up to date services for onshore shallow well completion, utilizing high-performance perforating systems, and advanced well completion solutions, in normal and hostile well environments.

Our Field Service unit is a Skid Unit with a simple Logging system. Kalrez Wireline performed both Open Hole and Cased Hole Services, especially for shallow well (Maximum depth services 1300 M).

Complete Basic Open Hole could be perform by us, except Acoustic Log (Sonic Log). Our services included : Gamma Ray , Resistivity (Short Guard & Deep Guard), Compensated Neutron, Compensated Density and Temperature.

Cased Hole Services including Gamma Ray, Neutron and Perforation.

With slim hole tools & simple system, we safe more operation time than complex logging system.



HISTORY OF KALREZ WIRELINE DIVISION

[20/04/2009]

In the year 2007, Kalrez Management decide to build Wireline Division using Wireline Unit, Tools & Equipments from Prakarsa Pramandita, PT. An engineering team was build consists of Mr. Yiyis Purosani, Mr. Nurdi, and Mrs. Silvia Angraeni.

Then Kalrez use PT.EPI as consultant to make an inspection for any requirement and proper maintenance. One senior wireline engineer from EPI was sent to Bula to collecting, prepare and test logging equipments.

After complete the all things as EPI recommendations, then Kalrez performed leader team to follow Logging training, both open hole and cased hole matters. First Field Logging training was in 25S-5 well (Cased Hole).

Perforation training conducted in real well at 79D-1, Bula Lemon Field. The well was flowing with oil & gas. This phenomenal well produced until maximum 65 BOPD from initial production that only 5 BOPD.

Finally, at April 2008, Kalrez decided to hire a wireline engineer to handles Kalrez Wireline Unit, names Mr. Ghiorso HS and a wireline operator names, Mr. Iwan Hanafi.